Greg's Blog
Our Chicago Loft
Adventures | Sonoma | Ireland | London II | Bike the Drive | Paris | London | LegoLand | Hawaii
Greg's Marriage Proposal | Photos
Our Wedding | Rehearsal | Her Story | His Story | Our Story | Family & Friends Photos | Videos
Alblum
View the Guestbook | Sign the Guestbook

Bathroom Remodel

Bathroom Remodel


When we bought the loft we knew that the bathroom downstairs had to be redone. We do not share the taste of the previous owner. We had put off the remodel until we knew we were going to stay in Chicago for awhile. Now that we will be in the loft for at least another four years, we decided it was time to remodel. There was also the issue that I was going to start to travel again. The project took about 3 weeks to complete. Everything took about twice as long as I anticipated. I did all of the work myself and will probably not do another bathroom remodel again if I can help it. Not to say I didn't have fun doing it but would rather just pay someone next time. The new bathroom has new tile (floor and shower), glass shower doors, new pedestal sink, new lights, new mirror, and dual shower heads with individual shower heads.



01-Original Bathroom and Tile 02-Greg Starts Demolition 03-More Demolition 04-Greg Poses For Picture 05-Clean Floor 06-Shower Rough In 07-Construction Zone 08-Shower Rough In 2 09-Waterproof Membrane 10-Mixing Floor Mortar 11-Finished Shower SubFloor 12-Plumbing For Right Shower 13-Plumbing For New Second Shower 14-Starting To Look Like A Shower 15-Tile Work 16-Grout 17-Shower Doors 18-Pedistal Sink 19-New Bathroom

JAlbum 4.4

Email Greg | Email Claire | ©2003 - 2004 Toon-Time.com